Thursday 20 March 2014

Week 3 - Slab


Our SS and BC confirmed the slab stage is completed. We were quick happy to hear the slab stage is completed on time. Great work by PD and they seems to be having control over the schedule.


Above picture shows the front entrance of the slab work. You can see the neighbour's house which is pretty much same level as ours. However our block has a deep cut at the entrance. Hope the front garden will be flatten when they finish slab and there won't be inward decline.


Above picture shows some cracks in the concrete after the completion of slab work.


This is again a close caption of the front concrete poured which is the entrance to the garage. It has some inconsistencies and doesn't look great.


As shown in above picture there is a big cut in front of the house probably around half a meter. This also has the neighbour's house which is pretty much same level as the road. Our block also had the similar level and did not have a noticeable slope before the cut.


According to the above picture the other side of the land has a vacant block which also has similar level as ours. This is how our block looked like before the cut.


Above picture shows the slab neighboring to the other house. There is not much gap between the height of two blocks. However there are no retaining walls though it was agreed to put retaining wall according to the engineering plan.


Same as previous picture but this shows the view towards back.


As shown in above picture backyard is not that big. It also does not have much slope.


Again the above shows the backyard but the view towards the neighbor's block.


This shows the left side of the block which is similar level as the neighboring block.