Monday 14 April 2014

Week 6 - Internal wall insulation, Heating, Solar panel & Wiring

Last week there was lot of rain so the bricklayer was not fixed. There was duct line for heating fixed and we also saw hot water lines and some electrical wiring. Some of the internal wall insulation batts were fixed but still there is more to go. 


As shown in the following photo the ducts are connecting to the central heating system installed just above one of the bedrooms. The mettle pipe goes all the way out through the roof tile.


Below is a closer look of the gas heater which shows it has 4 star rating.


Ducts are attached to the roof using a polythene sort of material. Not sure how long would it last but seems to be the normal practice.


We also noticed the TV antenna and Solar panel is been fixed and the roof tilling has been completed. 